INDUSTRY KNOWLEDGE THAT WILL SAVE YOU TIME & MONEY
Combined heat and power stations ensure that the energy from electricity production is used efficiently for the benefit of customers, and reduces the environmental impact of production. While these operations can differ in the fuels used, many of the current solutions result in significant wear in the pipeline systems. In classic coal and biomass power plants, abrasive erosion of the inner surface occurs as soon as the fuel is unloaded into the pipeline. The waste product, ash, is also problematic and causes wear on screw conveyors and pipe systems. Since the combustion cannot be stopped at will, fixed inspection and maintenance cycles are planned. This in turn means that all system components must maintain operational parameters until the planned replacement window. Longer-lasting pipeline components from Esser can reduce the frequency of replacement, which will save your operation time and money.
PRODUCTS
Series: ESSER 160 / ESSER 400 / ESSER TWIN 700 / ESSER TWIN 900
Available sizes: DN80 / DN100 / DN125 / DN150
Connection: Standard Flanges / Centered Flanges / Couplings
Wall thickness: Thick-walled and thin-walled straight pipes possible
Shapes: Straight pipes / Elbows R1000 (max 45° / smaller radii as 500 and 250 on request) / Reducers / Silo Truck Adaptor Pipes
Accessories: Couplings / Gaskets / O-Rings / Screws / Nuts / Washers
Standard: All pipes primed
Product-related services on request: Varnishing in different colors according to RAL Classic brilliant